Hydrogen-Aeolic Energy with Optimised eLectrolysers Upstream of Substation

Installation ongoing in Berlevåg

Electrolyser

The Cummins 2.5 MW electrolyser is housed in a 40-foot container.

Fuel Cells

Fuel cells (much smaller, 100 kW) are housed in a 20-foot container, here being pushed into the building.

Dry Coolers

The heat generated by the electrolyser will need to be dispersed by these dry coolers.

Hydrogen Tank

The 30 bar tank has been installed a few months back, and is ready to store the produced hydrogen.